Skip to content
Grupo Nabla

Electric vehicle charger installation

We assess the available power, design the installation and leave the chargers up and running.

  • Survey of the existing installation
  • Design and equipment supply
  • Electrical works and commissioning
  • Optional metering and monitoring

Message us on WhatsApp

Request a proposal

We use this information only to reply to your enquiry. Privacy policy.

Feasibility
We check the capacity of the panel and the service connection before defining the number and type of chargers.
Safe installation
Conduits, protective devices and grounding built to current regulations.
Charge management
Metering of each charging point to allocate costs and avoid demand peaks.
Two electric vehicle chargers installed by Grupo Nabla: one wall-mounted and one on a pedestal

Featured projects

  • Installation of 17 electric vehicle chargers, completed up to March 2026 in the City and Province of Buenos Aires.

View service: Electromechanical works