Skip to content
Grupo Nabla

Success story

Nutrien Ag Solutions: electrical upgrade of 18 farm centers

From 2023 to 2026, work at sites in Buenos Aires, Santa Fe, Córdoba and La Pampa, with the same technical criteria across the whole network.

Warehouse at a Nutrien Ag Solutions farm center, with a loading structure and company trucks

The starting point

Nutrien Ag Solutions needed to upgrade the electrical installations of its network of farm centers across several provinces.

What we did

  • We surveyed each farm center’s installations to define the work required.
  • We upgraded and replaced electrical switchboards, conduits and wiring.
  • From 2023 to 2026 we coordinated the work at 18 sites in Buenos Aires, Santa Fe, Córdoba and La Pampa.

The result

18 farm centers with upgraded electrical installations, with the same technical criteria across the whole network.

Do you have facilities in several locations?

We plan and carry out work across networks of sites, with the same standard at each one.