Success story
Claro: upgrade of a telecommunications site to 99 kW
Engineering and site supervision in Río Cuarto, with new shelters, two generator sets and 48 VDC power.
The starting point
Claro’s site in Río Cuarto needed more power and backup for its telecommunications equipment, without interrupting service.
What we did
- We developed the engineering for upgrading the site to 99 kW.
- We supervised the works: an additional split AC shelter, two generator sets and two 48 VDC power shelters.
- We planned and carried out the load transfers, tests and commissioning.
The result
A site upgraded to 99 kW, backed by its own generation and with power infrastructure ready for growth.
Does your technical room need more power or backup?
We handle the engineering, construction and commissioning, protecting service continuity at every stage.