Electrical infrastructure and energy efficiency for data centers
Engineering, works, measurements and monitoring so the room runs without interruption and with consumption under control.
- Electrical and grounding design
- Upgrade and expansion works
- Power quality studies
- Monitoring of consumption and variables
Request a proposal
- Continuity
- Short-circuit, selectivity and arc flash studies so that one fault does not take down the whole room.
- Measured consumption
- Real-time monitoring by panel and by circuit with SIGER, with alarms when values deviate.
- Maintenance
- Thermography, grounding measurements and maintenance of panels and substations.
Featured projects
- Claro Río Cuarto: engineering and construction management. Site power upgrade to 99 kW, adding a split AC shelter, two generator sets and two 48 VDC power shelters. Load transfers, testing and commissioning.
- La Rural de Buenos Aires: secure power installation, an 80 kVA UPS and paralleled generator sets (500 kVA + 350 kVA) for the IBC (International Broadcasting Center) of the Buenos Aires Youth Olympic Games.
- Telefónica: design and construction of the power upgrade of the ET Balcarce data center. Six 200 kVA UPS units, supply and bypass panels, and secure AC (CAS) panels. Sizing and installation of isolation transformers for the CAS panels.
