Telefónica: upgrade of the ET Balcarce data center with 1,200 kVA of UPS capacity
Design and construction, with six 200 kVA UPS units, secure AC switchboards and their isolation transformers.
The starting point
Telefónica’s ET Balcarce data center needed to expand its secure power capacity to keep up with the growth of its critical load.
What we did
- We designed and built the data center power upgrade.
- We installed six 200 kVA UPS units with their input and bypass switchboards.
- We installed the secure AC (CAS) switchboards, and sized and installed the isolation transformers that feed them.
The result
A data center with 1,200 kVA of UPS capacity and secure power distribution ready to operate without interruptions.